In October 2018

Coastal Field 3D seismic survey was formally started


Turnkey project of 3D seismic survey in Coastal Field was contracted by Kazakhstan Branch of BHG. The kick off meeting was held on 9 October 2018, and the seismic wave excitation parameters test was finished on 10 October. The survey operation was formally commenced on 18 October, and totally 90 km2 of seismic data was planned to be finished before 6 December 2018.





联系方式
更多
技术支持: 博网追新科技(北京)有限公司 | 管理登录
seo seo